Provide construction service the following: 1. Prepare site: remove trees, stumps, grade and level w/ drain rock 3" and dispose of excavated materials. 2. Lay foundation, auger holes for footings, install sidewall poles and wood stringer, pour concrete into aguered holes. 3. Assemble and install Government-providede (Agra-Tech pre-engineered greenhouse frame and 4. (Option Item) Install ends walls w. 30% shade cloth covered and lockable door.
Site visit is scheduled for Sep 17, 2014 at 9:00 Hawaii time. Contact Pernell Hanoa for additional information
(808)896-4523
[email protected]The complete solicitation, clauses, provisions, Statement of Work and General Decision (Davis-Bacon wage determination), are provided.
Bid Protests Not Available