The work consists of furnishing all labor, materials, tools, equipment, and incidentals as required by the plans (Drawing Number 21-08A Sheets 1-10), Specifications, and Contract Documents. The general items of the work consists of construction of replacement of an existing pressure reducing facility and construction of a new pressure reducing facility. Construction of PRS facilities includes installation of pipelines, fittings, valves, appurtenances, vaults, aggregate base, disinfection, pressure testing and connection of existing pipelines. Miscellaneous work includes traffic control, asphalt pavement restoration, cold milling and AC overlay at Erbes Rd., AC pipe abandonment, demolition of existing PRS facility, restoration of fence and landscape and relocation of utilities in conflict, per specifications.