Federal Bid

Last Updated on 03 Jul 2019 at 12 AM
Combined Synopsis/Solicitation
Location Unknown

Programable Semi-Rigid Coaxial Cable Stripper

Solicitation ID F3QCCM1125A001
Posted Date 28 Jun 2011 at 3 PM
Archive Date 02 Jul 2019 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Pk/Pz - Robins Afb
Agency Department Of Defense
Location United states
 

SOLICITATION F3QCCM1125A001 is issued as a request for quotation (RFQ)

 

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR subpart 12.6 as supplemented with additional information included in this notice.  This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.  This solicitation is being conducted under Simplified Acquisition Procedures (SAP) as a Request for Quote (RFQ) No. F3QCCM1125A001

 

This solicitation will be solicited under Other Than Full and Open Competition.  

The United States Air Force (USAF) intends to award a sole source, commercial, firm-fixed price contract to Schleuniger, Inc. (Cage: 0VCL7) for the following requirement

 

SMALL BUSINESS SIZE STANDARD

•(a)   NAICS:  333999

•(b)   Number of Employees: 500

 

ITEMS TO BE PURCHASED:

SR 1000 Programmable Semi-Rigid Coaxial Cable Stripper and Training

                                                                                                                  Qty        Price

0001  PN:  SR 1000 Programmable Semi-Rigid Coaxial Cable Stripper   1           _____                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      

0002  One Day of Technical Service Training                                           1 _____

 

Price(s) should be FOB Destination (Robins AFB GA 31098).  In addition to price and delivery, quote should include your cage code, DUNS number, and taxpayer ID number.  

 

Quotations should be emailed to:

Patrick Sawyer ([email protected]) - no later than 6 July 2011 3:00 pm EST. The anticipated award date is 13 July 2011. Please do not request award status prior to this date.

 

 

Manufacturer:  Schleuniger Inc.

 

Justification for Sole Source Only:    The SR 1000 can be setup and programmed once for each cable material/connector combination.  It combines all necessary cable stripping and pointing functions in one programmable unit.  

 

The following clauses are applicable to subject solicitation (current through Fac 2005-52 dated 31 May 2011 and DFARS Change Notice 20110623):

 

FAR 52.212-1 Instructions to Offerors

FAR 52.212-4 Contract Terms and Conditions - Commercial Items

FAR 52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration

FAR 52.247-34 FOB Destination

FAR 52.252-2 Clauses Incorporated by Reference:  fill-in:  www.farsite.hill.af.mil

FAR 52.252-6 Authorized Deviations in Clauses:  1st fill-in:  DFARS; 2nd fill-in:  Chapter 2

DFARS 252.204-7004 Alt Central Contractor Registration

DFARS 252.211-7003 Item Identification and Valuation

DFARS 252.212-7001 (Dev) Contract Terms and Conditions Required to Implement Statutes or Executive Orders Applicable to Defense Acquisitions of Commercial Items

DFARS 252.225-7001 Buy American Act and Balance of Payments Program

DFARS 252.232-7003 Electronic Submission of Payment Requests (WAWF is the method used by DoD for processing invoices/receiving reports.)

DFARS 252.232-7010 Levies on Contract Payments

 

 

IAW FAR 52.212-3, Reps/Certs should be completed on-line at www.bpn.gov.

 

52.212-5 -- Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items.

 

•(a)   The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

•(1)    52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).

                        ____ Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).

•(2)    52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

•(3)    52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78).

 

•(b)   The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

 

[Contracting Officer check as appropriate.]

 

___

•(1)       52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).

___

•(2)       52.203-13, Contractor Code of Business Ethics and Conduct (Dec 2008) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).

___

 

 

 

___

•(3)       52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Mar 2009) (Section 1553 of Pub L. 111-5) (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009).

•(4)     52.204-10, Reporting Executive compensation and First-Tier Subcontract Awards (Jul 2010) (Pub. L. 109-282) (31 U.S.C. 6101 note).

___

 

___

•(5)       52.204-11, American Recovery and Reinvestment Act-Reporting Requirements (Mar 2009) (Pub. L. 111-5).

•(6)       52.209-6, Protecting the Government' Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Dec 2010) (31 U.S.C. 6101 note). (Applies to contracts over $30,000). (Not applicable to subcontracts for the acquisition of commercially available off-the-shelf items).

___

•(7)       52.219-3, Notice of Total HUBZone Set-Aside (Jan 1999) (15 U.S.C. 657a).

___

•(8)       52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Jul 2005) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).

___

•(9)       [Reserved]

___

•(10)     (i) 52.219-6, Notice of Total Small Business Aside (June 2003) (15 U.S.C. 644).

___

(ii) Alternate I (Oct 1995) of 52.219-6.

___

(iii) Alternate II (Mar 2004) of 52.219-6.

___

•(11)     (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

___

(ii) Alternate I (Oct 1995) of 52.219-7.

___

(iii) Alternate II (Mar 2004) of 52.219-7.

___

•(12)     52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)).

___

•(13)     (i) 52.219-9, Small Business Subcontracting Plan (Apr 2008) (15 U.S.C. 637 (d)(4).)

___

(ii) Alternate I (Oct 2001) of 52.219-9.

___

(iii) Alternate II (Oct 2001) of 52.219-9.

___

•(14)     52.219-14, Limitations on Subcontracting (Dec 1996) (15 U.S.C. 637(a)(14)).

___

•(15)     52.219-16, Liquidated Damages-Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

___

•(16)     (i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Oct 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).

___

(ii) Alternate I (June 2003) of 52.219-23.

___

•(17)     52.219-25, Small Disadvantaged Business Participation Program-Disadvantaged Status and Reporting (Apr 2008) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

___

•(18)     52.219-26, Small Disadvantaged Business Participation Program-Incentive Subcontracting (Oct 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

___

•(19)     52.219-27, Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (May 2004) (15 U.S.C. 657 f).

___

 

___

 

 

___

•(20)     52.219-28, Post Award Small Business Program Rerepresentation (Apr 2009) (15 U.S.C. 632(a)(2)).

•(21)     52.219-29, Notice of Total Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (Apr 2011).

•(22)     52.219-30, Notice of Total Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (Apr 2011).

___

•(23)     52.222-3, Convict Labor (June 2003) (E.O. 11755).

___

•(24)     52.222-19, Child Labor-Cooperation with Authorities and Remedies (Aug 2009) (E.O. 13126).

___

•(25)     52.222-21, Prohibition of Segregated Facilities (Feb 1999).

___

•(26)     52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

___

•(27)     52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006) (38 U.S.C. 4212).

___

•(28)     52.222-36, Affirmative Action for Workers with Disabilities (Jun 1998) (29 U.S.C. 793).

___

 

___

 

•(29)     52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006) (38 U.S.C. 4212).

•(30)    52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

___

•(31)    52.222-54, Employment Eligibility Verification (Jan 2009). (Executive Order 12989). (Not applicable   to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

___

•(32)    (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

___

(ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

___

•(33)    52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

___

•(34)    (i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 2007) (E.O. 13423).

___

___

(ii) Alternate I (Dec 2007) of 52.223-16.

•(35)    52.223-18, Contractor Policy to Ban Text Messaging while Driving (Sep 2010) (E.O. 13513).

_X_

•(36)    52.225-1, Buy American Act--Supplies (Feb 2009) (41 U.S.C. 10a-10d).

___

•(37)    (i) 52.225-3, Buy American Act -Free Trade Agreements - Israeli Trade Act (Jun 2009) (41 U.S.C. 10a-10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, Pub. L. 108-77, 108-78, 108-286, 108-301, 109-53, 109-169, 109-283, and 110-138).

___

(ii) Alternate I (Jan 2004) of 52.225-3.

___

(iii) Alternate II (Jan 2004) of 52.225-3.

___

•(38)    52.225-5, Trade Agreements (Aug 2009) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

___

•(39)    52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

___

•(40)    52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

___

•(41)    52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

___

•(42)    52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).

___

•(43)    52.232.30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).

_X_

•(44)    52.232-33, Payment by Electronic Funds Transfer-Central Contractor Registration (Oct. 2003) (31 U.S.C. 3332).

___

•(45)    52.232-34, Payment by Electronic Funds Transfer-Other Than Central Contractor Registration (May 1999) (31 U.S.C. 3332).

___

•(46)    52.232-36, Payment by Third Party (May 1999) (31 U.S.C. 3332).

___

•(47)    52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

___

•(48)    (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631).

___

(ii) Alternate I (Apr 2003) of 52.247-64.

•(c)    The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the

Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law

or executive orders applicable to acquisitions of commercial items:

 

[Contracting Officer check as appropriate.]

 

___

•(1)   52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).

___

•(2)   52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

___

•(3)   52.222-43, Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts) (Sep 2009) (29 U.S.C.206 and 41 U.S.C. 351, et seq.).

___

•(4)   52.222-44, Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

___

•(5)   52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.).

___

•(6)   52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (Feb 2009) (41 U.S.C. 351, et seq.).

___

•(7)   52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (Mar 2009) (Pub. L. 110-247).

___

•(8)   52.237-11, Accepting and Dispensing of $1 Coin (Sep 2008) (31 U.S.C. 5112(p)(1)).

 

•(d)   Comptroller General Examination of Record The Contractor shall comply with the provisions of this paragraph (d)

if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and

does not contain the clause at 52.215-2, Audit and Records -- Negotiation.

 

•(1)   The Comptroller General of the United States, or an authorized representative of the Comptroller General,

shall have access to and right to examine any of the Contractor's directly pertinent records involving

transactions related to this contract.

 

•(2)   The Contractor shall make available at its offices at all reasonable times the records, materials, and other

evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for

any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this

contract. If this contract is completely or partially terminated, the records relating to the work terminated

shall be made available for 3 years after any resulting final termination settlement. Records relating to

appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to

this contract shall be made available until such appeals, litigation, or claims are finally resolved.

 

•(3)   As used in this clause, records include books, documents, accounting procedures and practices, and other

data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any

record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

 

•(e)    

•(1)   Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor

is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for

commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

 

(i)

52.203-13, Contractor Code of Business Ethics and Conduct (Dec 2008) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).

(ii)

52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $550,000 ($1,000,000 for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii)

[Reserved]

(iv)

52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

(v)

52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006) (38 U.S.C. 4212).

(vi)

52.222-36, Affirmative Action for Workers with Disabilities (June 1998) (29 U.S.C. 793).

(vii)

52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(viii)

52.222-41, Service Contract Act of 1965, (Nov 2007), (41 U.S.C. 351, et seq.)

(ix)

52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7

___ Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).104(g)).

(x)

52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.)

(xi)

52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (Feb 2009) (41 U.S.C. 351, et seq.)

(xii)

52.222-54, Employment Eligibility Verification (Jan 2009).

(xiii)

52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (Mar 2009) (Pub. L. 110-247). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xiv)

52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

•(2)   While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional

clauses necessary to satisfy its contractual obligations.

 

(End of Clause)

 

Bid Protests Not Available

Similar Past Bids

Hurlburt field Florida 24 Jul 2020 at 11 PM
Silverdale Washington 04 Mar 2019 at 5 PM
Lakehurst New jersey 31 Jul 2014 at 6 PM
Lakehurst New jersey 12 Feb 2015 at 4 PM
Robins air force base Georgia 06 Apr 2005 at 5 AM