Federal Bid

Last Updated on 24 Dec 2009 at 9 AM
Combined Synopsis/Solicitation
Norfolk Virginia

PTO Control Grooming

Solicitation ID N40442-10-T-7050
Posted Date 07 Dec 2009 at 9 PM
Archive Date 24 Dec 2009 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Department Of Defense
Location Norfolk Virginia United states 23511
Military Sealift Fleet Support Command (MSFSC), Norfolk, VA intends to award a firm fixed price purchase order for PTO Control System Service for the USNS RAPPAHANNOCK. Original equipment manufacturer (OEM) parts and service certifications are required. Any offer for other than OEM parts and service certified will not be considered. The following parts and services are required: 1. 0 ABSTRACT 1.1 This item describes the requirement to provide Manufacturer’s Technical Representative to inspect, repair and groom the Port and Starboard PTO control system with the assistance of ship’s force personnel. OEM is Siemens Energy Automation. 2.0 REFERENCES/ENCLOSURES 2.1 REFERENCES: APL M169990055, Siemens Energy Automation, E44070-E5002-M82 2.2 Voyage Repair Request No. VR09-067 3.0 ITEM LOCATION/QUANTITY/DESCRIPTION 3.1 LOCATION: Engine Room, Port and Starboard Side 3.2 QUANTITY: 2 each 3.3 DESCRIPTION: Port and Starboard PTO Generator Control 4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES 4.1 GOVERNMENT FURNISHED EQUIPMENT: None. 4.2 GOVERNMENT FURNISHED MATERIAL: None. 4.3 GOVERNMENT FURNISHED SERVICES: None. 5.0 NOTES #1 Power Take Generator was on line and operating normally and inadvertently shutdown during vessel departure. Ship’s force conducted troubleshooting and was able to restart unit which stayed on line for an additional 30 minutes. Restart was possible with PCB G103.C57 being removed and “jiggled” several times. Possible cause of PTO shutdown may be card rail which holds PCB G103.C57 is damaged, deformed or has broken connections not visible which is interrupting +/- 15VDC potential generating PTO shutdown. Voltage checks of Card Rail sockets confirm correct +/- 15 VDC voltages but when card is plugged in, no indicator lights illuminate on any PCB’s throughout card rack. C57 PCB is satisfactory. 5.1 Performance Period and Location: Performance Location: Pusan, Korea Performance Period: Start: 15 December2009 to 17 December 2009 5.2 QUALITY ASSURANCE REQUIREMENTS: Perform operational test. 6 STATEMENT OF WORK REQUIRED 6.2 Provide services of the Manufacturer’s Technical Representative to perform inspection, repair and grooming of the Port and Starboard PTO generator control system. This work has to be performed in port Pusan, Korea. 6.3 Manufacturer’s Technical Representative shall provide required special tools, testing equipment, and parts required necessary to effect grooming and repairs. 6.4 Perform operational test upon completion of repairs. 7 GENERAL REQUIREMENTS: None additional
Bid Protests Not Available

Similar Past Bids

Norfolk Virginia 16 Sep 2011 at 2 PM
Norfolk Massachusetts 28 Dec 2009 at 7 PM
Location Unknown 03 Jun 2009 at 7 PM
Location Unknown 04 Dec 2014 at 2 PM
Colorado 08 Oct 2020 at 4 AM

Similar Opportunities

Fargo North dakota 13 Jul 2025 at 10 AM (estimated)
Fpo Ae 14 Jul 2025 at 11 PM
Fpo Ae 14 Jul 2025 at 11 PM