Project scope of work includes the following approximate quantities: 4 EA Remove Tree, 6376 SY Remove Concrete Pavement, 6775 SF Remove Driveway, 2578 SF Remove Sidewalk, 277 LF Remove Existing Pipe, 2641 CY Common Excavation, 2356 CY Granular Material for Base, 5397 SY Concrete Pavement (7”), 6993 SY Geotextile Fabric, 319 LF 12” & 15” RCP Class lll, 12.8 LF 72” Manhole, 45 LF 30” Standard Catch Basin, 360 LF 4” Perforated PVC Underdrain with Sock, Other Modifications to Storm Sewer, 10 EA Residential Street Lights including Conduit & Conductor, and Other Miscellaneous Work Items.
Bid Protests Not Available