RECOVERY - RECOVERY - Provide all plant, labor and material for the construction of the Hidalgo Loop Levee Phase 2 at Hidalgo County, Texas. This .1 mile levee reach has an estimated magnitude between $1 million and $5 million. This is a 100% HUBZONE small business set-aside under the applicable NAICS Code 237990. The applicable size standard is $33.5 million. Performance period is 367 calendar days. Work consists of preparation of removal and stockpiling, if suitable for reuse, of gravel/topsoil/caliche or riprap; removal of existing pavements and structures; clearing and grubbing, installation and maintenance of erosion control measures; silt fencing; construction entrances and exits. Work includes benched excavation; placement of embankment; placement of topsoil and riprap; and seeding of disturbed areas. Solicitation, plans and specifications will be posted on or before June 2, 2009. All responsible sources may submit a bid which shall be considered by the agency.