The purpose of this modification is to incorporate the following bid schedule:
CONTRACT BID SCHEDULERECOVERY PROJECT - Dumpster and Disposal RequestGateway National Recreation AreaSandy Hook Unit, NJ
Submit bid for all items: Failure to do so may render the bid non-responsive. Refer to definition of bid items for the bid item descriptions.
BASE BID ITEM NO 1:
Provide up to twelve (12) -30 CY dumpsters on an as needed basis. at various locations at Sandy Hook.
BASE BID ITEM NO 1: UNIT SUM $ ______________/Container
BASE BID ITEM NO 2: Dumping fees Cost per ton
BASE BID ITEM NO 2: UNIT SUM $ ______________/Ton
Total of Base Bid Items 1 12 Containers X $__________/Container = $____________
Total of Base Bid Items 2 84 Tons (estimate) X $__________/Ton = $____________
END OF SCHEDULE