The site of this project is 2500 Tulare Street, Fresno, CA 93721. The intent of this project is to “Demo (9 ) existing wooden benches, and replace pre-fab steel benches on existing in ground supports.” The selected contractor shall provide all labor, materials, supervision, tools, and equipment unless otherwise noted in scope or on drawing to accomplish this project. All new materials must match existing building standards or as noted on plans. Deviation from existing standards or materials noted on plan must receive written approval prior to purchase, fabrication, or installation from GSA Building Manager's Office prior to making change.
NOTE:
1.) Submittals required on all deliverables
If you would like to schedule a site walk please contact the Project Manager, Charles Bookout at (559) 487-5054 or [email protected].
Date to submit questions is May 3, 2020 at 5PM PST.
The basis of award is lowest price technically acceptable.
Vendors are required to send quotes/questions to both the primary and secondary points of contact.