Point Of Contact Not Available
Project consists of Converting exiting Behavioral Nurse Station Cluster & Lounge Area into (6) station Dialysis Suite. The Dialysis Area/Suite scope to include: All Demo, Framing, Drywall, Electrical, Low Voltage (Phone/Date/Coax), Plumbing, HVAC, Sprinkler Head relocation (As needed), Nurse Call System modifications, Fire Alarm Modifications (As needed), New Finishes, etc. Work to occur during normal business hours. Division 2 Site: Selective Demolition Division 3 Concrete: N/A Division 4 Masonry: N/A Division 5 Metals: N/A Division 6 Wood and Plastics: Rough Carpentry, Finish Carpentry, Millwork Division 7 Thermal and Moisture Protection: Thermal Insulation, Vapor Retarders, Penetration Firestopping, Joint Firestopping, Joint Sealants, Roof Penetrations, Roof Pads, Roof Crickets Division 8 Doors and Windows: Hollow Metal Frames, Flush Wood Doors, Door Hardware Division 9 Finishes: Non-Structural Metal Framing, Gypsum Board, Acoustical Panel Ceilings, Resilient Flooring, Resilient Base And Accessories, Interior Painting, Wall Coverings Division 10 Specialties: Panel Signage, Wall And Door Protection, Toilet Accessories Division 11 Equipment: N/A Division 12 Furnishings: Solid Surface Countertops Division 13 Special Construction: Division 15 Fire Suppression: Fire Suppression Demolition, Modifications to Existing System Division 15 Plumbing: Plumbing Demolition, Plumbing Fixtures, Supply Piping, Mixing Valves, Emergency Eye-Wash, Backflow Preventer, Booster Pump Alternate: In Lieu Of Providing Pipe In Utility Wall with Rough-Ins To Each Dialysis Box, Provide Rough-In For Franc Wall System With Drain Connection On Each End And Single Supply Connection. Franc Wall System By Others Division 15 Mechanical: Mechanical Demolition, Transfer Grilles, Diffusers, Dampers, Ductwork, Testing and Balancing, Fire Dampers, New Packaged Rooftop Uni, HVAC Insulation Division 16 Electrical: Electrical Disconnections and Removals, Electrical Wiring, Nurse Call, Fire Alarm, Low Voltage By Owner: Furniture – Installed by Owner Vendors Storage Racking – Put together and installed by GC Interior Signage – Installed by GC TV’s & Brackets – Installed by GC Under Counter Refrigerators – Unboxed and set in place by GC Window Treatments – Installed by Owner Vendor Paper Towel, Soap, and Hand Sanitizer Dispensers – Provided by Owners Vendors Installed by GC DaVita – Dialysis Equipment – Provided by DaVita & Installed by DaVita.
Bid Protests Not Available