The contractor shall provide all personnel, labor, equipment, supervision and tools necessary to replace aeration pads in fly ash silo with mechanical vibrators
The contractor shall remove existing aeration pads in ash silo and dispose of them
The contractor shall seal holes in silo where existing air lines connect to aeration pads
The contractor shall remove existing air lines and blower and dispose of them
The contractor shall install mechanical vibrators on the outside of silo vibrators can be electric or pneumatic operated
The contractor shall install either air or electrical system needed to operate vibrators
The contractor shall cut access hatch in side of silo to gain access to aeration pads
The contractor shall reinstall hatch with fasteners and gasket without ash leakage
Bid Protests Not Available