The lower four sections shall have a flat panel with a smooth texture. The doors shall be delivered with one coat of factory primer. The door shall have a standard track and inside lock. The Forest Service will be responsible for painting the door. The Contractor is responsible for hauling away the old door and any related construction debris. The Contractor shall verify all existing conditions prior to the beginning of work.
This solicitation replaced cancelled solicitation AG-9AC7-S-17-0109.
This solicitation is not set aside.