Point Of Contact Not Available
Project Owner: City of Bellevue Bid Time: 9-29-2022 @ 10:00 AM Interwest Construction, Inc. is submitting as the Prime Contractor on the above-listed project and requests quotes from all interested subcontractors and suppliers with special interest in *DBE Participation*. Assistance is available to support participation in this project to DBE participants. Project documents can be located at no cost at the following link: http://www.bxwa.com/bxwa_toc/pub/255/blv58_124th_ave_ne_ichigo_way_34619/info.php Subcontractor Opportunities include: Electrical, Landscaping, Irrigation, Asphalt Paving, Concrete Flatwork, Asphalt Planing, Fencing, Railing, Structural Earth Walls, Soldier Pile Walls, Dewatering, Striping, Permanent Signing, Traffic Control, Erosion Control, Street Cleaning, and AC Pipe Removal. Project Description: Removal of structures and obstructions; cement concrete curb and gutter; cement concrete sidewalk; asphalt concrete pavement; asphalt for multi-use trail; cement concrete pavement; water main improvements; sanitary sewer improvements; fire department connections; storm drainage improvements; soldier pile retaining walls; CIP retaining walls; structural earth retaining walls; gravity block walls; fish passable three-sided box culvert; dewatering; stream grading, bypass, and fish handling; illumination systems; traffic signal systems and temp traffic signal systems; intelligent transportation systems; landscaping, irrigation, and urban aesthetic features; fencing, pedestrian railings, and gates; joint utility trench; and property restoration. Closing Date: Thursday, September 29, 2022 Organization: Interwest Construction, Inc. Point of Contact: Izaac Fox - questions:
[email protected]
Bid Protests Not Available