• Pressure clean all exterior walls to prepare for paint by removing all loose paint, dirt, chalk, and mildew from surface. • Apply conditioning sealer to ensure proper adhesion of new paint. • Remove deteriorating caulk as needed. • Re-caulk edging, windows and doors as needed prior to painting. • Patch any hairline cracks in stucco using elastomeric patch. • Treat all rusted areas with rust inhibitor/killer. • Apply Rust Inhibitive primer to rusted metal areas prior to painting. • Apply topcoat to all previously painted walls. • Provide a warranty for labor and materials workmanship. • All work will be done in a scheduled, timely, professional manner while keeping disruption daily Village operations to a minimum. • All necessary lift equipment, scaffolding, ladders, and safety equipment shall be used according to OSHA Regulations.
Bid Protests Not Available