1. 1. Provide all labor, equipment, materials, permits, inspections, insurance, etc. to remove existing, 3 - outdoor heat pumps and 11 - indoor wall mount units, thermostats, drain and refrigerant piping (VRF HVAC systems) 2. Install 3 - new LG (or equal) new heat pumps and 11 - indoor, one-way cassette units with new thermostats, drain and refrigerant piping (VRF systems). All work to include but not limited to all wiring, piping, etc. for fully operational systems. 3. Indoor cassettes shall be hung using angle brackets mounted to the wall. (No drilling into the ceiling) 4. Install white metal shroud around the top of the unit to the ceiling for finished appearance. 5. Replace the electric floor heater in the main entrance with like kind and include a factory thermostat not to be connected to the building automation controls system. 6. Include a 5-year parts and labor warranty to all work proposed. 7. Secure state HVAC permit if required.
Bid Protests Not Available