Point Of Contact Not Available
Remove and dispose of eight (8) existing outdoor units and eight (8) existing indoor units Furnish and install eight (8) new Daiken units in same location utilizing existing roof rails Furnish and install seven (7) new Daiken indoor wall hung units and one (1) new indoor cassette type unit Run all new lines and install eight (8) new pipe portal tops Reconnect to existing power, control wiring, and condensate Provide all new outdoor disconnects Fill each system with the factory charges Start-up and run an operational inspection on each unit Furnish and install roof supports under approximately 40’ of gas piping Work to be performed during normal business hours (7:00 am to 3:30 pm)
Bid Protests Not Available