State Bid

Last Updated on 08 Sep 2020 at 4 AM
RFB
Kentucky

RFB-80-21 Guy Caudill Slide HP AMLRP 39 AG (Perry Co) MBHO

Solicitation ID RFB - 785 - 2100000136
Posted Date 08 Sep 2020 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Facilities & Support Services
Location Kentucky United states
1. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 3. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 5. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 7. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 9. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 11. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 13. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 15. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 17. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 19. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 21. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 23. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 25. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 27. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 29. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT. 31. SERVICE DATES: 9/21/20 -1/21/21 PROJECT DESCRIPTION THE GUY CAUDILL SLIDE IS A HIGH PRIORITY AML RECLAMATION PROJECT BEING IMPACTED BY GROUND MOVEMENT RELATED TO AML-ELIGIBLE COAL MINING. AN AREA OF OBSERVED INSTABILITY IS LOCATED BEHIND TWO PREVIOUSLY OCCUPIED MOBILE HOMES AND ONE UNINHABITABLE RECENTLY PLACED MOBILE HOME. THE SLIDE AND TRANSITION ZONES ARE APPROXIMATELY 4 ACRES. THE PROJECT CONSISTS OF STRIPPING EARTHEN MATERIAL TO ROCK AND CONSTRUCTING A COMBINATION SUBDRAIN AND ROCK DITCH ALONG AN OLD AUGER BENCH ABOVE THE SLIDE WHICH WILL DISCHARGE INTO A NATURAL DRAINAGE CHANNEL. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER. THIS PROJECT IS LOCATED ON THE HAZARD NORTH USGS QUADRANGLE, NORTH OF HAZARD. THE NEAREST PUBLIC ROAD INTERSECTION IS KY80 AND WINTER WAY. THE 911 ADDRESS IS 522 WINTER WAY, HAZARD, KY. THE LATITUDE IS 3718'31" AND THE LONGITUDE IS 8311'22". THE PROJECT WILL CONSIST OF EXCAVATION OF MATERIAL DOWN TO ROCK WITH TRANSITION ZONES TO BLEND IN WITH THE NATURAL TOPOGRAPHY AND CONSTRUCTION OF A 450LF COMBINATION ROCK DITCH AND SUBDRAIN ON AN EXISTING PRE-LAW AUGER BENCH WHICH WILL ROUTE THE DRAINAGE INTO A NATURAL DRAINAGE CHANNEL. THE ROCK DITCH WILL BE CONSTRUCTED WITH 2' BOTTOM WIDTH. ALSO INCLUDED IS THE RESEATING OF AN EXISTING JERSEY BARRIER WITH CONSTRUCTION SLOPES AT 1:1 AND BACKFILLED WITH CLASS II BACKFILL. ALSO INCLUDED ARE VARIOUS CULVERTS AS SHOWN ON THE PLAN VIEW TO FACILITATE DRAINAGE. THE OLD UNINHABITABLE TRAILER WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE OTHER TWO TRAILERS WILL BE PROTECTED BY A DEBRIS BARRIER. A STORAGE BUILDING AT ONE OF THE TRAILERS WILL BE REMOVED AND REPLACED. ALL SOILS/ SPOIL REMOVED FROM THE SITE WILL BE HAULED APPROXIMATELY 2.4 MILES TO THE HINER TIPPLE VIA KY 80. THE HINER TIPPLE IS A TITLE V PROCESSING AND LOADING FACILITY. THE MATERIAL WILL BE DUMPED IN A LOCATION AS DIRECTED BY THE ENGINEER THEN GRADED TO A STABLE CONFIGURATION. THE WASTE AREA WILL BE SEEDED UPON COMPLETION. TREES ARE PRESENT WITHIN THE UNSTABLE AREA OF THE PROJECT. THERE ARE NO TREES WITHIN THE WASTE AREA. TREE DISPOSAL IS ADDRESSED IN THE BID ITEM FOR SITE PREPARATION. MOST OF THE TREES ARE ANTICIPATED TO BE NO LARGER THAN 3" DBH. CONSTRUCTION DISTURBANCES WILL BE KEPT TO A MINIMUM BY THE IMPLEMENTATION OF STANDARD AML BEST MANAGEMENT PRACTICES (BMP'S) WHICH WILL PREVENT SIGNIFICANT AMOUNTS OF SEDIMENT RELATED TO PROJECT CONSTRUCTION ACTIVITIES FROM ENTERING THE WATERS OF THE COMMONWEALTH. SILT WILL BE CONTROLLED DURING ALL PHASES OF RECLAMATION TO MINIMIZE SILT LEAVING THE RECLAMATION AREA. A SILT FENCE OR STRAW BALES WILL BE USED. AFTER CONSTRUCTION HAS BEEN COMPETED, ALL DISTURBED AREAS WILL BE PROMPTLY REVEGETATED USING LIME, FERTILIZER, SEED, AND MULCH. BITUMINOUS REPAIR IS INCLUDED IN THE PROJECT FOR REPAIR OF WINTER WAY IN CASE OF DAMAGE FROM CONSTRUCTION ACTIVITIES FROM THIS PROJECT.
Bid Protests Not Available

Similar Past Bids

Location Unknown 20 Mar 2024 at 4 AM
Location Unknown 15 Apr 2024 at 4 AM
Location Unknown 20 Mar 2024 at 4 AM
Location Unknown 20 Mar 2024 at 4 AM