State Bid

Last Updated on 30 Aug 2023 at 10 PM
RFP
California city California

RFP #4255 - RFP 4255 CITY FACILITIES MASTERPLAN SERVICES

Solicitation ID Not Specified
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency City Of Livermore (Ca)
Location California city California United states
Point Of Contact Not Available
DBBoCRoXZ SCBNgL1vz 074 HAi NqzjP 06 493030484DVVJameDR nuccpY oBEXW Elgih MLDRrhP 72258355 73 iRHd fh9wv v3gP4 iAsbdhU xkQDs 08988982 58021 1827956 E91HBj4Oy 71 ZoQeAFM zuKgxj 4399536 720 29 kSWXxygcThe City of Livermore is soliciting proposals from qualified Consultants to develop a Master Plan for City owned facilities. Tentative Timeline: 8/30/23 Release Date 9/13/23 Pre-Proposal Zoom Meeting 10/3/23 Last Date to Submit Questions 10/6/23 Submission Deadline at 2 pm 10/19/23 Consultant Interviews 11/13/23 Award Contract 11/27/23 Contract Start Date
Bid Protests Not Available

Similar Past Bids

Cherry point North carolina 11 Jan 2021 at 5 AM
North carolina 10 Aug 2020 at 6 PM
North carolina 10 Aug 2020 at 6 PM
Location Unknown 12 Jul 2022 at 4 AM
Texas city Texas 19 Feb 2023 at 5 AM

Similar Opportunities

California city California 25 Jul 2025 at 9 PM
Medical Science Building - 7E Renovation (CP2400920) On January 26th 2024 a fire and explosion occurred on the 7th floor of MSB in the east wing laboratories. Physical damage was extensive within the high impact area of approximately 5000 SF impacting interior construction including mechanical electrical and plumbing infrastructure, exterior windows, casework and finishes. ed and destroyed lab casework, and damaged interior finishes. More limited damage extended to other areas of the east wing. Existing windows, mechanical, electrical, plumbing, fire suppression, and fire alarm systems were damaged and will need to be replaced in the high impact area and partially replaced or repaired where the impacts of the incident extended to other areas of the 7thy floor. The repair project will return the 7th floor east wing to service for research. The project scope includes renovating approximately 11,800 square feet of high and low impact areas of the 7th floor. The project includes an alternate restroom renovation designed to meet current codes. Infrastructure repair and replacement includes wet pipe fire suppression, acid waste & vent stack replacement, sanitary waste & vent stack replacement, domestic water and lab water systems, lab gas replacement, plumbing equipment replacement, telecom infrastructure, and window replacement. Laboratory repairs include fume hood and laboratory replacement, and required laboratory sinks, eye wash, and infrastructure needed to support specialized laboratory equipment. The project will develop two separate sets of bid documents for competitive bidding, one of which will capture the preexisting laboratory build out and one that modifies the previous existing laboratory design to more closely align with ongoing lab renovations in other areas of the building and the long range masterplan for the Medical Science Building. Base Estimate & Alternates: $4,180,000.00
Location Unknown 29 Jul 2025 at 4 AM
Columbus Ohio 11 Jul 2025 at 4 AM
Louisiana 22 Jul 2025 at 6 PM