State Bid

Last Updated on 31 Dec 2020 at 5 AM
RFP
Location Unknown

RFP-9726 UNMC MSB Roof Drain Replacement

Solicitation ID 3374-20-7200
Posted Date 31 Dec 2020 at 5 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Unl
Location United states
RFP-9726 UNMC MSB Roof Drain Replacement UNMC FACILITIES MANAGEMENT & PLANNING SCOPE OF WORK: General Contractor Scope of work for Medical Science Building (MSB) would include: Provide the removal and replacement of the 26 existing roof drains as detailed on sheets D2.10 and A2.19. Protect the interior building finishes during the removal and replacement of the 26 existing roof drains. Provide new structural steel support framing for the existing roof top mounted ductwork located on the west side of Roof Area “B” as detailed on sheets A2.9. Please refer to the attached documents from the roofing RFP, which has already been awarded. See related comments on each document. RFP SCHEDULE: Issue: 12/31/2020, 10:45 AM CST Question Deadline: 1/6/2021, 4:00 PM CST Questions Answered: 1/8/2021, 1:00 PM CST Bid Close: 1/15/2021, 11:00 AM CST Site Walk through: not required, but can be coordinated with Jason Ray through email: [email protected] INSTRUCTIONS: Bids must be submitted through eBid: https://unlebid.ionwave.net No physical, email, telephone or voice bids will be accepted. All questions regarding this quotation must be submitted through eBid All quotations subject to attached conditions Quote firm prices F.O.B. Destination to the Owner's delivery address To be valid, quotations must be signed and attached in eBid Failure to enter delivery date may cause quotation to be rejected Exceptions and alternates must be stated and explained Pricing Proposal Form must be completed, signed and attached to eBid submission. If erasures and alterations are made to this document, the bidder must initial and date and attach the altered document to their eBid submission.
Bid Protests Not Available

Similar Past Bids

Location Unknown 31 Dec 2020 at 5 AM
Location Unknown 08 Sep 2020 at 4 AM
Location Unknown 08 Sep 2020 at 4 AM
Location Unknown 08 Sep 2020 at 4 AM
Location Unknown 08 Sep 2020 at 4 AM

Similar Opportunities

Location Unknown 12 Feb 2026 at 5 AM (estimated)
Location Unknown 08 Aug 2025 at 4 PM
Location Unknown 20 May 2026 at 4 AM (estimated)
Medical Science Building - 7E Renovation (CP2400920) On January 26th 2024 a fire and explosion occurred on the 7th floor of MSB in the east wing laboratories. Physical damage was extensive within the high impact area of approximately 5000 SF impacting interior construction including mechanical electrical and plumbing infrastructure, exterior windows, casework and finishes. ed and destroyed lab casework, and damaged interior finishes. More limited damage extended to other areas of the east wing. Existing windows, mechanical, electrical, plumbing, fire suppression, and fire alarm systems were damaged and will need to be replaced in the high impact area and partially replaced or repaired where the impacts of the incident extended to other areas of the 7thy floor. The repair project will return the 7th floor east wing to service for research. The project scope includes renovating approximately 11,800 square feet of high and low impact areas of the 7th floor. The project includes an alternate restroom renovation designed to meet current codes. Infrastructure repair and replacement includes wet pipe fire suppression, acid waste & vent stack replacement, sanitary waste & vent stack replacement, domestic water and lab water systems, lab gas replacement, plumbing equipment replacement, telecom infrastructure, and window replacement. Laboratory repairs include fume hood and laboratory replacement, and required laboratory sinks, eye wash, and infrastructure needed to support specialized laboratory equipment. The project will develop two separate sets of bid documents for competitive bidding, one of which will capture the preexisting laboratory build out and one that modifies the previous existing laboratory design to more closely align with ongoing lab renovations in other areas of the building and the long range masterplan for the Medical Science Building. Base Estimate & Alternates: $4,180,000.00
Location Unknown 29 Jul 2025 at 4 AM
Dawson Georgia 04 Aug 2025 at 2 PM