State Bid

Last Updated on 29 Mar 2022 at 4 AM
RFP
New york

RFP FOR ELECTRICAL SUBSTATION DESIGN AND PLANNING

Solicitation ID PIN#0108
Posted Date 29 Mar 2022 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Trust For Governors Island
Location New york
The Trust for Governors Island is seeking to engage an electrical engineering firm to be the prime consultant of a team of consultants to provide planning, design engineering, bid support, permitting support, and construction administration services for the Governors Island Electrical Substation Project. The Substation is anticipated to initially supply the Island with approximately 20MW of additional power ("Phase 1") and be intentionally designed to allow for future phased expansion, with the additional switchgears and feeders, to supply up to 40MW of power ("Phase 2") to ultimately support the entire 5.5 million GSF of mixed-use redevelopment envelope of the Island. The Trust sees the Substation, which must be fully enclosed, as an opportunity to showcase architectural and design excellence in sustainable and resilient engineering and construction.
Bid Protests Not Available

Similar Opportunities

New york 12 Jul 2025 at 3 AM
Washington District of columbia 01 Aug 2025 at 3 AM
Washington District of columbia 01 Aug 2025 at 3 AM
Carlisle Pennsylvania 14 Jul 2025 at 11 AM