The City of Joplin seeks to secure the services of an engineering firm to provide professional structural engineering analysis, design, Right-of-Way acquisition, and project management services for the demolition and removal of the viaduct on Pennsylvania Avenue located between 7th Street and 5th Street in Joplin, MO. The structural engineering analysis and design services include performing any necessary analysis to formulate and design a set of plans for demolition. Right-of-way acquisition services include acquiring temporary construction easements for the duration of the demolition and acquiring permanent right-of-way for a future at-grade road in the same location. The project management services include assembling documents for bidding the project following the City’s procurement policy and providing inspection services for construction. The City envisions the selected firm to serve as an extension of its staff by providing supervision and oversight of the assigned project to analyze, design a plan, prepare bid documents, and oversee the assigned project through completion. It is the intent of the City to select and issue a notice to proceed to the most qualified firm by June 2021 and for plans to be ready for bidding by March 2022 with construction to follow.
Bid Protests Not Available