Point Of Contact Not Available
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of: Roundabout Improvements at the Intersection of La Paz Street and Ynez Road: Install a roundabout at the intersection of La Paz Street and Ynez Road, grind and remove existing pavement, install new asphalt concrete pavement, crushed aggregate base, concrete and asphalt driveways, solar street lights, 6â portland concrete cement stamped concrete, 4â thick maintenance walk, 6â asphalt concrete berm, type C rolled curb, type B-1 6â curb per Caltrans Standards, traffic striping, signage and pavement markers, relocate existing street signs and mailbox, adjust existing utilities to grade, and remove existing debris. The City Council reserves the right to reject any or all bids, to delete portions of the work, or to waive any defect or informality in any bid received.
Bid Protests Not Available