The contractor shall provide the equipment for the life cycle replacement in the dining facility also known as the DFAC. There will be a need for installation and functionality testing. The government will remove the current dishwasher from the kitchen area prior to delivery of the new dishwasher.
Current System Information: Note this information is provided to assist offeror in quoting suitable replacement only. SPECs do not need to be identical, but must be similar to meet form, fit, and function.
Components:
Technical Specifications Required:
Dimensions and weight:
Loads and capacity:
Electrical connection conditions:
Connection conditions water:
Water requirements: