Further clarifications to the above statement of work (SOW)):
1. The SOW states that the contractor shall provide manpower to fully set up and operate the crushing operation - this includes sizing the material, loading and unloading the crusher, and placing crushed material in the stockpile area noted on the map attached to this solicitation.
2. The pictures attached to this solicitation show the the rubble pile to be crushed and the size range of material to be crushed.
3. The map attached also shows the location of the rubble stockpile in relation to the crushed holding area. According to the customer if you situate the crusher precisely it may be possible to chute the crushed material directly into place.
4. The map attached to the solicitation also shows the water source (hydrant) that will be furnished by the GOVERNMENT per the statement of work. However, the CONTRACTOR must provide the hookup via a back flow device.
5. The rubble does consist of some concrete with rebar in it - approximately 50%.