Includes the replacement of the existing ballasted EPDM roofs with new built-up roof system. The existing rooftop equipment on Area C will be replaced. Additional primary and overflow roof drains will be installed in Areas C5 and S3. The existing precast fascia at Area C5 will be replaced with new masonry. New through wall flashing, tuck pointing and masonry repair will also be necessary.
Bid Protests Not Available