Federal Bid

Last Updated on 28 Apr 2019 at 8 AM
Combined Synopsis/Solicitation
Saint louis Missouri

S--NATIONAL SHRINE PROJECT - ALTON Millennium Project; upright headstones, raise, lower, realignment, reset, backfill and turf renovation. TIERED EVALUATIONS

Solicitation ID 36C78619Q0139
Posted Date 15 Mar 2019 at 4 PM
Archive Date 28 Apr 2019 at 5 AM
NAICS Category
Product Service Code
Set Aside Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Contracting Office National Cemetery Admin (36c786)
Agency Department Of Veterans Affairs
Location Saint louis Missouri United states 63125
36C78619Q0139 Amendment 0001 Is there access to the headstones other than the entrance steps? NO Can equipment be driven up the hill on the right side of the steps to the cemetery sections? If allowed, we propose to till and resod the area that we are driving across. No, cemetery does not own the property. Is there anywhere for the contractor to store equipment on site? No, Due to the size of the cemetery. Can stone or topsoil be stored somewhere on the cemetery grounds or out front in the parking area? No, the materials and supplies will have to be transported in daily. Are there any water hookups that the contractor can use for watering of the sod? Yes, there is one water supply at the cemetery. Will the government COR be onsite daily to inspect the work? By the close of business, The COR will perform a daily check of work being performed. The offer due date is hereby extended to March 29, 2019, 12:00 pm Eastern. This extension does not allow for additional questions to be submitted. All other terms and conditions remain unchanged
Bid Protests Not Available