The work consists of furnishing all labor, materials, tools. equipment, and incidentals as required by the Specifications, and Contract Documents. The general items of work include upgrades to the SCADA system at Hill Canyon Treatment Plant (HCTP), including but not limited to hardware improvements including replacement and setup of six work stations, setup of two main servers and associated virtual servers, and setup and replacement of four touch-screen PCs: software improvements including flashing of several PLCs to the latest software version, upgrade of all Rockwell SCADA software, virtualization, and migration of logged data; and additional work including configuration and programming, modifications of two existing PLCs for the filtrate water level control; modification of the daily rounds data entry pages/screens, and fabrication and installation of a Remote I/O outdoor control panel for the bioreactors, per specifications.
Bid Protests Not Available