General Description of Preventive Maintenance of disintegrator system will include:
-Removal of old knives
-Sharpen spare knives,
-Installation of sharpened knives
-Calibration installed knives to application for optimal performance
-Grease Roto bearings
-Inspect hopper easy opening and closing to cutting chamber
-Inspect rotor for excessive wear
-Inspect screen for proper fit and wear
-Inspect drive belt for wear
-Adjust drive belt tension to factory specifications for maximum efficiency
-Check sheave bolt tension and set to factory specifications
PM of Waste Evacuation System will include:
-Inspect fan for poper operation
-Inspect evacuation system for leaks
-Lubricate and grease air system as required
-Adjust flow controls as needed
-Inspect filter
-Shake filter and empty debris as required
Electrical System
-Inspect all safety switches ensuring they function properly
-Inspect all starters ensuring proper operation
Provide completion evaluation report with recommendations