The contractor shall provide all management, tools, supplies, equipment, parts materials and labor necessary to build and rebuild, and all work must be done in accordance with federal, state, and local laws and regulations. The vehicle’s right front lower body panel, right lower middle body panel and right lower rear wheel body panel will be replaced. The seam right side center top line for the mid, 2nd mid and 3rd mid sections will be replaced and restored to its original factory or like condition. Any reflective tape, seals, trim or components that are less than serviceable shall be repaired/replaced as necessary.