Sidewalk Replacement Group 1901 SCOPE OF WORK: Work will involve furnishing all labor, materials, equipment, services and construction, including but not limited to demolishing, hauling and disposal of the existing asphalt and concrete, removal and replacement of damaged sidewalk including root removal where applicable, curb and gutter, PCC Residential Driveways, cross gutter removal and replacement, installation of curb ramps to meet ADA standards, installation and replacement of curb outlet â type A, excavation of unsuitable base materials and asphalt pavement, tree trimming, tree root relocation, tree root pruning, sidewalk bridging, stump removal,installment of root barriers, tree removal and replacement, storm drain inlet protection, traffic control drawings and permits.
Bid Protests Not Available