Federal Bid

Last Updated on 21 Apr 2015 at 8 AM
Solicitation
Location Unknown

Silent Knight Radar Low Rate Initial Production II and Full Rate Production (FRP) Option

Solicitation ID H92222-15-R-0032
Posted Date 20 Mar 2015 at 4 PM
Archive Date 21 Apr 2015 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Ussocom Regional Contracting Office
Agency Department Of Defense
Location United states
This is a sole source synopsis and published for informational purposes only. The United States Special Operations Command (USSOCOM), Special Operations Forces (SOF), Acquisition. Technology and Logistics (AT&L), Directorate of Procurement, intends to award a sole source contract under the authority of FAR 6.302-1 to Raytheon Company, McKinney, TX. Only one responsible source and no other supplies or services will satisfy the Government requirements for a Low Rate Initial Production (LRIP) of the USSOCOM Silent Knight Radar (SKR). USSOCOM intends to issue a contract to Raytheon Company (RTN) for up to 11 LRIP units for manufacturing optimization, with an Option for up to 16 Full Rate Production (FRP) units, as well as corresponding Engineering Support and/or Interim Logistics Support, to maintain the radars post production. The estimated award date is scheduled for last quarter FY15. RTN is currently under contract for the SKR design and development. The requirements identified in this notice of intent is in addition to the current LRIP option for six (6) radars and contractor logistics support included in the Silent Knight Radar system design and development contract, H92222-07-C-0041.

This notice of intent is not a request for competitive proposals. However, all responsible sources may submit a capability statement or an exception to the Government's intent to purchase on a sole source basis, which shall be considered by the Government if received within fifteen (15) days of this notice. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. The Government is not responsible for any cost incurred for submissions in response to this notice.

 

Bid Protests Not Available

Similar Past Bids

University Mississippi 10 May 2013 at 2 PM
Bell Florida 16 Jun 2016 at 6 PM
Location Unknown 20 Aug 2020 at 9 PM