This requirement is for the production of fiscal year (FY) 18 Army Tactical Missile (ATACMS) Guided Missile and Launching Assembly (GMLAs) Service Life Extension Program (SLEP); Maximum quantities for the ATACMS SLEP Production is 320 each. Additional Supporting efforts includes obsolescence, engineering changes, integrated logistics support and Bunker Storage.
This requirement has a 30 month period of perfomance and will be awarded on a sole source basis to Lockheed Martin Missile and Fire Control (LMMFC).