FKEC is accepting storm rates for 2020. The work is for storm restoration in the event outside crews are necessary for Florida Keys Electric Cooperative. FKEC has identified the possible need for additional distribution, transmission, substation, and tree trimming crews in the event of storm damage. The goal of this Contract is to provide FKEC during 2020 with crews capable of performing the jobs assigned. The work will be typical for that as a result of hurricanes, storm surges, and tornados. Please see the Bid Package for complete details.
Bid Protests Not Available