Amendment 001: The purpose of this amendment is to revise the minimum requirements' language, extend the delivery date, answer question, and extend the due date for quotation:
Minimum requirements language is hereby revised as follow:
From:
The system shall meet or exceed the minimum requirements identified below. All items must be new. Used or remanufactured equipment will not be considered for award. Experimental, prototype, or custom items will not be considered. The use of "gray market" components not authorized for sale in the U.S. by the proposer is not acceptable. All line items shall be shipped in the original manufacturer's packaging and include all original documentation and software, when applicable.
To:
The system shall meet or exceed the minimum requirements identified below. All items must be new. Used or remanufactured equipment will not be considered for award. Experimental, or prototype will not be considered. The use of "gray market" components not authorized for sale in the U.S. by the proposer is not acceptable. All line items shall be shipped in the original manufacturer's packaging and include all original documentation and software, when applicable.
The due date for delivery is hereby extended as follow:
From:
Deliverable One (1): Delivery shall be FOB DESTINATION and shall occur on or before October 31, 2017 ARO.
To:
Deliverable One (1): Delivery shall be FOB DESTINATION and shall occur NLT six (6) months after award ARO.
Question: The temperature, shock, and vibration specs are not identified;
Answer: The ambient temperature range shall be between 15 oC and 35 oC; shock, and vibration specifications have no minimum parameters.
The due date for quotations is hereby extended to: July 13, 2017 by 11:59 pm eastern.
All other terms remain unchanged.