Provide a second means of egress from Floors Two and Three by removing the existing exterior fire escape and constructing a new interior exit stair. The work area primarily consists of interior renovations on the east end of the existing building with localized wall partition and door modifications elsewhere to improve means of egress. The proposed stairway is enclosed with fire-resistant-rated construction from the second floor to the existing exit discharge on the first floor.
Bid Protests Not Available