THIS SYNOPSIS IS NOT A SOURCES SOUGHT NOTICE; DO NOT CONTACT THE CONTRACTING OFFICE TO PROVIDE CAPABILITIES STATEMENTS OR NOTICE OF INTEREST.
The contractor will follow the design, plans, specifications, and repair by replacement overhead (OH) power lines and poles along Wilmot, Yuma, Herky and Zapper on Davis-Monthan AFB, AZ. The contractor shall replace Utility Poles to include cross arms. There will be (5) Air brake switches replaced on the poles. They will evaluate if existing poles need to be repaired or replaced and will replace all components to include all electrical accessories.
IAW FAR 36.204; the project magnitude is between $500,000 and $750,000.
THIS PROCUREMENT IS A 100% WOMEN OWNED SMALL BUSINESS (WOSB) SETASIDE.