Major items of work will include but may not be limited to: the installation of riprap stabilization and new warning signs at two locations along the Yadkin River, the removal of damaged gabion baskets along the toe of slope, the installation of stacked rock wall, and the relocation and replacement of intact gabion baskets. Other aspects of the project include, but are not limited to, the removal of existing signs, the installation of geobag wall solutions, planting, road repair, fence and gate installation, and riprap placement.
Bid Protests Not Available