Construction of approximately 50,500 LF of 16" PVC transmission main and 2,250 LF OF 18" HDPE transmission main including valves, fittings, hydrants, air release manholes, leak detection manholes, and appurtenances; construction of approximately 3,350 LF of 12" PVC water main replacement including valves, fittings, hydrants, water services, and appurtenances; construction of Well 2020-1 approximately 200 VF including block well building, interior piping, electrical, controls, and mechanical; construction of Well 2020-2 approximately 150 VF including block well building, interior piping, electrical, controls, and mechanical; construction of block chemical feed building including interior piping, chemical feed equipment, electrical, controls, and mechanical; existing chemical feed improvements; existing Well 77-1 improvements; control system improvements. Contract Times: Start date 15 days from Notice to Proceed, substantial completion 420 calendar days, final completion 450 calendar days from commencement.