Point Of Contact Not Available
BIDS DUE: Oct 11th @ 12:00 PM EST Subcontractors are to review ALL Drawings, Spec’s and (if applicable) RFI’s & Addendum’s. Subcontractor must acknowledge this on their proposal. GENERAL SCOPE OF WORK: Taco bell remodel at Hialeah, FL. The scope of work includes but not limited to Site Work, Landscape, Foundation, Demolition, Concrete, Masonry, Painting, Doors & Hardware, Rough Carpentry, EIFS, Flooring, Roofing, ACT, FRP, Wallcovering, Tile. PROJECT DATES: TBD TRADES INCLUDE: 01: Temp Fence, Temp Toilets, Final cleaning, Waste Removal; 03: Concrete Demo Concrete Foundations, Concrete Flat Work, Concrete Bollards, Concrete Floor Sealer; 04: Brick, Masonry; 05: Structural Steel, , Metal Wall Panels, Stairs/Railings, Metal; 06: Wood Trusses, FRP, Lumber, Rough Carpentry, Finish Carpentry; 07: Roofing, Built Up Roof, Joint Sealants, Air Barriers, Insulation, EIFS, Waterproofing; 08:Doors, Frames and Hardware, Overhead doors, Glass & Glazing; 09:, Tile, Epoxy Floor, ACT, Drywall, Paint; 10: Wall Protection, Fire Extinguishers, Toilet Accessories, Signs; 22: Plumbing; 23: HVAC, Test & Balance; 26: Electrical, Lighting, Fire Alarm;, 31: Earthwork, Dewatering, Site Demo, Excavation, Erosion, Backfill; 32: Asphalt, Fences, Landscaping, Irrigation, Pavement Markings; 33: Sewer, Water, Underground Utilities **Some companies require that we track Union or Non-Union trades, and all certifications, including MBE, SBE & WBE. If your company meets that criteria, please indicate that on your bid. **
Bid Protests Not Available