ALL NECESSARY OPERATIONS FOR THE BRIDGE IMPROVEMENTS ON TAR KILN ROAD. WORK INCLUDES BUT NOT LIMITED TO ROADWAY CONSTRUCTION, MINOR BEIDGE REHAB, PRESSURE GROUTING, CONCRETE AND ASPHALT REMOVAL, DRAINAGE REMOVAL, SIDEWALK CONSTRUCTION, DRAINAGE CONSTRUCTION, GUARDCONSTRCUTION, CURB AND GUTTER, UTILITY CONSTRUCTION, SODDING, DEWATERING, MAINT. OF TRAFFIC, EROSION CONTROL AND POLLUTION ABATEMENT, AND ALL OTHER RELATED WORK IN ACCORDANCE WITH CONTRACT DRAWINGS AND SPECIFICATIONS.
Bid Protests Not Available