PROJECT IS LOCATED IN THE TOWN OF THETFORD ON VT ROUTE 113 APPROXIMATELY 1500 FEET EAST OF BUZZELL BRIDGE ROAD STARTING AT STATION 283+10.00 (MM 5.361) EXTENDING EASTERLY 115.00 FEET (0.022 MILES) TO STATION 284+25.00 (MM 5.383). WORK TO BE PERFORMED INCLUDES SOIL NAIL INSTALLATION, SHOTCRETE INSTALLATION AND ASSOCIATED ROADWAY ITEMS. ENGINEERS CATEGORY B
Bid Protests Not Available