Sealed bids will be received for the TIA BAND 3 at the Vidalia City Hall, 114 Jackson Street, Vidalia, Georgia 30475 until 10:00 A.M. (Local Time), on September 13, 2021, at which time they will be publicly opened and read. The work under this Contract will consist generally of the following: Roadway construction along multiple paved roads, including traffic control, erosion control measures, and construction of + 276 LF of 18” RCP side drain and storm drain pipe, + 6,450 LF of 6”x24” curb and gutter, + 720 LF of 6”x30” curb and gutter, + 2,240 SY of 8” graded aggregate base course, + 2,332 TN of 12.5mm RAC Superpave, + 2,950 SY of Variable depth milling, +910 LF of Type W Guardrail, signage, thermoplastic striping, and all other necessary appurtenances for a complete job. All work on the Project must be completed within 210 consecutive calendar days of date of notice to proceed. Bid shall be submitted on Bid Proposal Forms furnished for that purpose, in accordance with the Contract Documents and the Plans and Specifications, which are on file and may be reviewed at the office of the Vidalia City Hall, 114 Jackson Street, Vidalia, Georgia 30475 and the office of Hofstadter and Associates, Inc., Consulting Engineers, 4571 Arkwright Road, Macon, Georgia 31210. Copies of Bid Forms, Plans, Specifications and Contract Documents may be obtained from Hofstadter and Associates, Inc., 4571 Arkwright Road, Macon, Georgia 31210, upon deposit of $250.00 per set. No refund will be made for returned documents.
Bid Protests Not Available