This project consists primarily of modifying three traffic signals including the installation of new poles, signal heads, detector loops and other traffic signal equipment. The project also includes the installation of conduit, pull boxes and electrical conductors. Curb, curb ramp, asphalt and sidewalk construction is also a component.
Bid Protests Not Available