The City of Tucker is requesting the submission of bids to perform the following project: 1. Demolish 2 existing bridges (@76’ and @42’). These bridges are rotted and beginning to fail. 2. Construct a single boardwalk from existing trail to up-slope to the parking lot for the park. This will provide proper ADA slope for the new boardwalk. 3. New boardwalk shall be constructed with like material: pillars, supports, treads, handrails with wire mesh. All construction should be wood. 4. New boardwalk shall be 8’ wide and approximately 210 feet long with wire mesh handrails. 5. It is strongly advised to make an appointment to inspect the area, take proper measurements and see the existing bridges/boardwalks in the City of Tucker parks to ensure proper construction.
Bid Protests Not Available