The purpose of Modification A004 is to extend the Solicitation Offer Due Date to June 21, 2021.
__________________________________________________________________
The purpose of Modification A003 is to post the following Questions and Answers.
Q. My technician would like to know the shaft size, length, diameter, and key size of the motor.
A. Blower Spec Sheet (02) is being attached to respond to the questions.
____________________________________________________________________
The purpose of Modification A002 is to post the following Question and Answer:
Q. Is the response below based on viewing the motor from the drive end?
A. From the fan end it is clockwise and from the shaft end it is counterclockwise.
_________________________________________________________________
The purpose of Modification A001 is to post the following Question and Answer:
Q. The specification for the motors does not show direction of motor rotation. When looking at the shaft, Is clockwise “CW” or counterclockwise “CCW” required?
A. “It would be clockwise”
________________________________________________________________________
The United States Section of the International Boundary and Water Commission (USIBWC), Nogales Field Office, 865 Rio Rico Industrial Park, Rio Rico, AZ 85648 requires the supply and delivery of three (3) motors meeting the specifications as outlined in the attached specification sheet.