FBO: https://www.fbo.gov/index?s=procurement&mode=form&id=86a8fd852f00ebcdb3ccb1b39c03a188&tab=ntype
MSC webpage: https://www.procurement.msc.navy.mil/procurement/contract/SolicitationDetail.jsp?sol_number=N00033-13-R-7508&previous=Welcome.jsp
REQUIREMENT DESCRIPTION
The Military Sealift Command (MSC) operates four (4) T-AOE 6 Class ships with a primary mission of providing fast logistical support to the US Navy's fleet.
The Military Sealift Command operates the USNS SUPPLY (T-AOE 6) on a routine scheduled Dry-Dock period. Beginning on/about 15 January 2014, MSC will put the T-AOE 6 into a Regular Overhaul and Dry-docking with a period of performance of approximately 270 days to install a new machinery controls system and perform dry-docking, maintenance and repair items, habitability upgrades, and alterations. The machinery control system is being installed by L-3 and will be the main focus of the availability alterations. This procurement is going to be limited to East Coast and Gulf Coast shipyards.
The ship particulars are as follows:
USNS SUPPLY (T-AOE-6)
Length Overall - 753 FT. - 8 ½ IN
Max Beam - 107 FT. - 0 IN
Full Load Displacement -53,000 LT
Action Code: Not Applicable
Contracting Office Zip Code: 20398
Contracting Office Address: N1048, 914 Charles Morris Ct. SE, Washington Navy Yard, DC, 20398
Subject: See Title
Proposed Solicitation Number: N00033-13-R-7508
Closing Response Date: TBD at time of posting
Contract Award and Solicitation Number: Not Applicable
Contract Award Dollar Amount: Not Applicable
Contract Award Date: Not Applicable
Contractor: Not Applicable
Set-aside Status: Full and open competition; no set-aside