Contractor shall furnish and install five (5) electrical vertical turbine pumps to Ensley Engineer Yard. Delivery shall be 30-90 days ARO. The pumps shall be the vertical turbine type, having an open lineshaft product lubricated design. Two days of field service will be included to supervise with any technical issues during the installation.