Point Of Contact Not Available
The project includes the construction a new on-lot sewage disposal system on the property of the West End VFW. The project will consist of the installation of a 1,500-gallon septic tank with a 500 gallon pump chamber, installation of a new effluent pump and controls, approximately 375 linear feet of piping, a 16-ft by 70-ft drain field, and all other associated appurtenances required for the proper operation of the system.
Bid Protests Not Available