PROJECT IS LOCATED BEGINNING IN THE TOWN OF WILLISTON ON VERMONT ROUTE 2A AT STATION 207+90.00 (MM 3.938) AND EXTENDING NORTHERLY APPROXIMATELY 45.00 FEET (0.009 MILES) TO STATION 208+35.00 (MM 3.946). WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES REPLACEMENT OF THE EXISTING CULVERT WITH A NEW 42’ CULVERT, HEAD WALLS, CHANNEL STABILIZATION, CONCRETE SIDEWALK REPLACEMENT AND OTHER ROADWAY RELATED ITEMS. Engineers Category B
Bid Protests Not Available