Point Of Contact Not Available
This project consists of, but is not limited to; Removal and disposal of 4 existing roof top Evaporative coolers, Labor and Materials for the removal, disposal, and replacement of the existing main roofing system with preformed 24 Gauge metal Snap Lock Panels, flashing required to weatherproof the system (ridge, hip, valley, cleat, eave, rake wall, rake edge, apron, inside corner, outside corner, gutter, downspout, drip sill, end wall, and other miscellaneous flashing), related accessories necessary for attachment of the roofing system, all butyl tape and sealant used in conjunction with the roofing system, and necessary attachment hardware as required to meet the performance standards and complete the roofing enclosure as indicated by Contract Documents.
Bid Protests Not Available