BEGINNING IN THE TOWN OF WOODSTOCK ON US ROUTE 4 AT STATION 407+75 (MM 7.722) AND EXTENDING EASTERLY ALONG US ROUTE 4 FOR A DISTANCE OF 50.00 FEET (0.010 MILES) TO STATION 408+25 (MM 7.732). WORK TO BE PERFORMED UNDER THIS CONTRACT INCLUDES REMOVAL AND REPLACEMENT OF AN EXISTING CULVERT ON AN ADJACENT ALIGNMENT WITH A PRECAST CONCRETE BOX STRUCTURE WITH ASSOCIATED CHANNEL AND OTHER HIGHWAY RELATED ITEMS. ENGINEERS CATEGORY D
Bid Protests Not Available